CREATING THE Right Time Railway

DAVID HORNE worked for South West Trains at the time of the introduction of the 2004 timetable. He recalls the benefits of the seminal recast

Attention to detail was key to the South West Trains timetable change in December 2004 which – now 15 years ago – delivered a 12% improvement in Public Performance Measure (PPM) within a year.

Want to read more?

This is a premium article and requires an active subscription.

Existing subscriber? Sign in now

No subscription?

Pick one of our introductory offers