Siemens reboots affordable signalling renewals

 

Good value scheme: the North Wales Coast resignalling. This is the passing loop at Mostyn installed as part of the contract, which required erection of the bracketed signal post, the largest signalling structure in the programme. A Class 175 passes on 23 February 2018, shortly before commissioning.
Rhodri Clark

When a long-established industry claims it cannot afford to renew one of its vital systems, something is clearly awry. Back in 1998, Railtrack Chief Executive Gerald Corbett told me the company could no longer make a business case for renewing signalling: a policy of patch and mend life extension showed a better Net Present Value.

Concern over signalling costs did not go away with the arrival of Network Rail. The focus for cost reduction was the labourintensive mechanical signalling on lightly used lines.

Around 2007-08 this resulted in a challenge to the signalling majors to develop a lowcost modern equivalent. This proposal was known as Modular Signalling, or Modsig for short.

Want to read more?

This is a premium article and requires an active subscription.

Existing subscriber? Sign in now

I have a subscription but need to register on site…

You will need your print Customer ID ready to set up an account, you'll find this on your welcome email and cover sheet delivered with each print magazine.

Register now

No subscription?

Pick one of our introductory offers