Trackwatch - April 2022 issue

 

A digest of the main changes on Network Rail, London Underground and Northern Ireland Railways infrastructure during January 2022; compiled by Martyn Brailsford of the Branch Line Society (www.branchline.uk).

EAST MIDLANDS

Toton (4:14A)

A number of track alterations have been completed in Toton North Yard. Reception Road No 3 has been re-laid closer to Reception No 2, and sidings 1, 3 and 4 have been replaced with two additional through Reception Roads, No 4 & No 5. It is believed the remaining sidings, 5 to 14, have been renumbered 6 to 15. To the west of road 15, two roads (16 and 17) have been laid for a new Automotive Terminal, with two of the lines by the ‘Traction Maintenance School’ having been lifted to make room for the associated car holding area.

Want to read more?

This is a premium article and requires an active subscription.

Existing subscriber? Sign in now

I have a subscription but need to register on site…

You will need your print Customer ID ready to set up an account, you'll find this on your welcome email and cover sheet delivered with each print magazine.

Register now

No subscription?

Pick one of our introductory offers